OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Bonnyrigg Reservoir Refurbishment

Abergeldie delivered the Bonnyrigg Reservoir Refurbishment project through a collaborative framework with Sydney Water Corporation. Delivered in a tight shutdown period with much of the works carried out at heights under confined space conditions, scope included the demolition of the existing metal clad roof and structural steel support frame and access, refurbishment of existing ancillary equipment, installation of new steel support framework, and sheeting, hand railing and access.

Client

Sydney Water

Year

2017

Region

NSW

Share

m
Reservoir Diameter
ML
Storage Capacity
m
Reservoir Depth
RELATED PROJECTS
default
Coolmunda Dam Gates Variable Counterweights Refurbishment
DCIM101MEDIADJI_0129.JPG
Murrumba Downs STP Sludge Dewatering and Biosolids Out-loading Renewal
Balickera Tunnel Entrance
Balickera Tunnel Remediation
Cessnock WWTW Upgrade Project Aerial Photo
Cessnock Wastewater Treatment Works Upgrade
Caboolture South Recycled Water Disinfection Facility
Caboolture South Recycled Water Disinfection Facility