GOODNA STP MECHANICAL AND PIPING INSTALLATION

Project Description:

Abergeldie was contracted by Thiess Pty Ltd to carry out the complete mechanical fit out and the above ground pipe installation for the Goodna STP upgrade 4A. The end user is Queensland Urban Utilities.

The upgrade involved the building and commissioning of the following areas:

  • Oxidation ditch
  • Primary treatment Area
  • Membrane bio-reactor
  • Blower room
  • Secondary anoxic area
  • Permeate slab
  • Chemical storage area
  • Methanol storage tank and accessories
  • The service water system
  • The wash water system
  • The foul liquor pump station

Abergeldie was also involved in the design, supply, install and commissioning of the instrument air system, reclaimed effluent, potable water, citric acid dosing, alum dosing and caustic dosing systems.

Business unit:

Engineering

Client:

Thiess Pty Ltd

Current status:

Complete

Start date:

May 2013

Completion period:

May 2014

Value:

$5.7 million